Quantcast
Channel: RFPMart - Nebraska RFPs
Viewing all articles
Browse latest Browse all 1823

EQU-10376 - USA (Omaha, Nebraska) - Mobile Cellular Devices and Services - Deadline April 25,2024

$
0
0
(1) Vendor needs to provide mobile cellular devices and services to the government authority located in Omaha, NE.– In general, the proposer will deliver a complete and turnkey solution that will include design, manufacture, testing, delivery, and assistance with associated hardware, software, communications, all system interfaces.– Vehicle power hookups are provided in the vehicle sds cabinet and are located within 5 feet of the installation location.– Third–part device connections are not included in this procurement, though the provision to include 4 gbe network ports for those connections is included and is a requirement.– Hardware solution:– Mobile ruggedized cellular 5g router with wi–fi 6, 940mbps throughput, edge security with application aware multi–zone firewalls, ids and ips, internet security, and integration with avl systems with discrete active gnss with dead reckoning.– At minimum 4 gbe network ports for equipment internet and intranet connectivity.– Dc and gpio power.– Advanced level cloud management software licensing for each device for 5– year term.– Dual cellular and gps 5g antenna with surface roof vehicle mounting and all cable connectors to mobile cellular 5g router.– All required installation brackets and cabling for installation.– Software Solution:– Secure remote management of cellular 5G Routers.– Dynamic routing protocols for traffic steering.– Zone–based firewall and remote device connection.– Real–time troubleshooting and diagnostics.– Cellular Service:– Provide best in class 5G cellular connectivity.– Provide a static IP address for each device for remote connections.– Provide unlimited, non–throttled data connections for each device.– Provide cellular network priority.– Identify network service loss protection plan for emergency situations.– Include a 5–year all–inclusive service contract for each device.(2) All the questions must be submitted no later than April 11,2024.

Viewing all articles
Browse latest Browse all 1823

Trending Articles